Following on from the successful major residential complex at Winchester house, Bracknell, PSL were appointed by Comer Homes Group in 2018 to carry out the structural design of Mast Quay Phase II.

The development is immediately adjacent to the Phase I development on site directly onto the river Thames and next door to the Woolwich Ferry South terminal.

The development comprises of two residential towers, Block D – 14 stories, and Block E – 26 stories and which continue from Phase I with a Maritime theme with architectural ‘sail-type’ Glass fins/balcony extensions.

The buildings are positioned on a podium terrace providing pedestrian and emergency vehicle access.

Below the podium terrace is a single level car park with tidal defence ramp.

The towers are designed generally with 250 thick flat RC slabs and with stability provided by RC stair/lift cores.

PSL works include the design of foundations for one of the U.K.’s largest freestanding tower cranes at 80m to hook from Podium Level.

Frame construction at site is well advanced with Block D completed in early 2021 and the main tower (Block E) on programme to ‘top-out’ in early September.

Categories:

IMG_8829
IMG_8874
IMG_8856
IMG
IMG 3
IMG 2
1
 

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close