Cabul Road
PSL carried out full temporary works design services and RC detailing on this complex residential development in Cabul Road, Clapham Junction.
Temporary works design involved a façade retention system over four storeys including a singled level retaining structures to all sides of the site.
The design was developed by close collaboration between PSL/PPE Construction and the specialist ground worker and required complex coordination of temporary works design and construction method statement.
The major challenge was the retained façade and for which our proposals were based upon the advance construction of the main core enabling façade stability to be progressively transferred from temporarily retained existing masonry cross walls to the new structure.
3D views of the façade Temporary Works sequence are featured to the right.