Bishop’s Stortford North Primary School

The Bishop’s Stortford North Primary School is a new 3FE Primary School on former council allotment site as part of the Bishop’s Stortford North development.

 

The site, accessed from the Farnham Road, has significant topography (approx. 12m top to bottom) and has undergone a large-scale balanced cut and fill to provide upper terrace (school) and lower terrace (playing fields).

 

The building structure comprises a structural steelwork frame with PC wide plank floor being provided at GF (suspended) and FF.

 

The building envelope comprises an SFS system with external brickwork cladding.

 

A previously undeveloped site, the development has included the installation of 24-hour foul storage (90 m³) with pumped rising main to public drainage at the head of Rye Street (northern extents of the town).

 

The surface drainage system incorporates SuDS permeable pavements, open surfaces and balancing pond/restricted outfall to existing tributary of the River Stort.

 

The development achieved practical completion in August 2020 and is being ‘mothballed’ for opening in autumn 2021 (post Covid).

Categories:

IMG_4758
IMG_4761
IMG_4767
IMG_4772
IMG_4764
 

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close